How to calculate cement, sand quantity for Plastering
Cement Mortar Ratio for wall plastering 1:6
Cement Mortar Ratio for ceiling plastering 1:4
Plastering thickness should not be more than 12-15 mm.
If there is a need for an
additional coat don’t do that at one go.
Ensure you are using good quality of cement & Sand (In silt content test, we have
discussed how bad sand quality affects the work)
Also, ensure you are using measuring box (not head pan) for site mix ( Here is the
basic construction tools list)
Please do read the plastering checklist post for the complete list.
To calculate the cement and sand for 100 m2 plastering area in 1:6 ratio and
12 mm thickness
Plastering thickness 12 mm = 12/1000 = 0.012m
Volume of cement mortar required = ( Plastering Area x thickness )
= 100 m2 x 0.012m = 1.2 m3
(This is wet volume that means we need this much volume of cement
mortar after mixing water, So for dry volume, we have to add 30-35% as
bulkage of sand, we are using 35% and wastage as 20%)
Consider 35% Sand Bulkage = 1.2 m3 x (1+0.2+0.35) (Many of us
would use 1.54 as constant)
= 1.86 m3
Cement : Sand (Ratio)
= 1 : 6 ( Total = 1+6 = 7 Parts )
Cement required (1 Part)
= 1.86 x 1/7
= 0.265 m3
/0.0347
= 7.66 bags (Approx – 8 Bags)
Sand required (5 Part) = 1.86 x 6/7
= 1.59 m3
How much water required for plastering (1:4)-12mm thick
Step 1:- Assumptions
Area of Plaster = 100 m²
Thickness of plaster = 12 mm =0.012 m
Mix Ratio → 1:4
Step 2:- Volume of Plaster
∵Volume of plaster = Area of plaster x Thickness of plaster
Volume of plaster = 100 x 0.012=1.2m³
Add 20% extra Quantity for Filling of joints, Depressions & Wastage
∴Volume of plaster = 1.2 + [ (20x1.2) /100 ] =1.2 + 0.24 =1.44m³
Dry volume of plaster = Wet volume x 1.35
Dry Volume = 1.44 x 1.35m = 1.944 m³
Step3:- Quantity of Cement
Quantity of Cement = (Dry Volume of plaster x Cement ratio) / (Sum of the ratio)
Quantity of cement = (1.944 x 1) /(1+4)= 0.3888 m³
∵Density of Cement = 1440kg/m³
Weight of Cement = 1440 x 0.3888 = 559.872 Kg
∵ 1 bag of cement contains 50 kg of cement
Number of bags = 559.872 Kg/50 = 11.2 No’s
Step 4:- Quantity of Sand
∵ Cement : Sand :: 1:4
Quantity of Sand = Quantity of Cement x 4
∴ Quantity of Sand = 0.3888 m³ x 4 = 1.5552 m³
∵ 1m³=35.3147 Cubic Feet (CFT)
Quantity of sand = 1.5552 x 35.3147 = 54.921 CFT
∵ 1 brass = 100 CFT
Sand = 54.921 /100 =0.54921 Brass
∵ Density of sand = 1920 kg/m³
Weight of sand = 1.5552 x 1920 = 2985.98 kg
∵ 1 tonne = 1000 kg
Weight of sand in Tonne = 2985.98 /1000 =2.985 Tonne
Step 5:- Quantity of water
Quantity of water equals to 20% Total Dry material (cement & sand)
Quantity of water = 0.20 x (Weight of cement + Weight of sand )
∴ Quantity of water = 0.20 x (559.872+ 2985.98) = 709.2 kg = 709.2 Litre
How to calculate cement, sand quantity for Plastering
Cement Mortar Ratio for wall plastering 1:6
Cement Mortar Ratio for ceiling plastering 1:4
Plastering thickness should not be more than 12-15 mm.
If there is a need for an
additional coat don’t do that at one go.
Ensure you are using good quality of cement & Sand (In silt content test, we have
discussed how bad sand quality affects the work)
Also, ensure you are using measuring box (not head pan) for site mix ( Here is the
basic construction tools list)
Please do read the plastering checklist post for the complete list.
To calculate the cement and sand for 100 m2 plastering area in 1:6 ratio and
12 mm thickness
Plastering thickness 12 mm = 12/1000 = 0.012m
Volume of cement mortar required = ( Plastering Area x thickness )
= 100 m2 x 0.012m = 1.2 m3
(This is wet volume that means we need this much volume of cement
mortar after mixing water, So for dry volume, we have to add 30-35% as
bulkage of sand, we are using 35% and wastage as 20%)
Consider 35% Sand Bulkage = 1.2 m3 x (1+0.2+0.35) (Many of us
would use 1.54 as constant)
= 1.86 m3
Cement : Sand (Ratio)
= 1 : 6 ( Total = 1+6 = 7 Parts )
Cement required (1 Part)
= 1.86 x 1/7
= 0.265 m3
/0.0347
= 7.66 bags (Approx – 8 Bags)
Sand required (5 Part) = 1.86 x 6/7
= 1.59 m3
How much water required for plastering (1:4)-12mm thick
Step 1:- Assumptions
Area of Plaster = 100 m²
Thickness of plaster = 12 mm =0.012 m
Mix Ratio → 1:4
Step 2:- Volume of Plaster
∵Volume of plaster = Area of plaster x Thickness of plaster
Volume of plaster = 100 x 0.012=1.2m³
Add 20% extra Quantity for Filling of joints, Depressions & Wastage
∴Volume of plaster = 1.2 + [ (20x1.2) /100 ] =1.2 + 0.24 =1.44m³
Dry volume of plaster = Wet volume x 1.35
Dry Volume = 1.44 x 1.35m = 1.944 m³
Step3:- Quantity of Cement
Quantity of Cement = (Dry Volume of plaster x Cement ratio) / (Sum of the ratio)
Quantity of cement = (1.944 x 1) /(1+4)= 0.3888 m³
∵Density of Cement = 1440kg/m³
Weight of Cement = 1440 x 0.3888 = 559.872 Kg
∵ 1 bag of cement contains 50 kg of cement
Number of bags = 559.872 Kg/50 = 11.2 No’s
Step 4:- Quantity of Sand
∵ Cement : Sand :: 1:4
Quantity of Sand = Quantity of Cement x 4
∴ Quantity of Sand = 0.3888 m³ x 4 = 1.5552 m³
∵ 1m³=35.3147 Cubic Feet (CFT)
Quantity of sand = 1.5552 x 35.3147 = 54.921 CFT
∵ 1 brass = 100 CFT
Sand = 54.921 /100 =0.54921 Brass
∵ Density of sand = 1920 kg/m³
Weight of sand = 1.5552 x 1920 = 2985.98 kg
∵ 1 tonne = 1000 kg
Weight of sand in Tonne = 2985.98 /1000 =2.985 Tonne
Step 5:- Quantity of water
Quantity of water equals to 20% Total Dry material (cement & sand)
Quantity of water = 0.20 x (Weight of cement + Weight of sand )
∴ Quantity of water = 0.20 x (559.872+ 2985.98) = 709.2 kg = 709.2 Litre